Redevelopment At St Pancras

Wiremek successfully tendered to design, manufacture, deliver, test and commission the main HV/LV switchgear throughout the busy St Pancras railway station site.

From the outset, this was a challenging project due to time constraints, size and weight restrictions and access limitations to the existing buildings.

Working closely with the customer to ensure the design met the specification, Wiremek supplied and installed an HV distribution panel; designed and manufactured a PLC control system, and installed two 2MVA cast resin transformers directly coupled to two 3200A form 4 type 5 LV distribution panels. In addition, five form 4 type 5 main LV switchboards and five Lift auto change-over panels were delivered, re-assembled, tested and comissioned - all within the customer's demanding schedule.

The Result: 

  • Completion within an extremely tight timeframe
  • Specialist manufacture to meet specifications
  • Site challenges overcome without impact to project progress