Monitoring And Control At Harlow Leisurezone

Wiremek was contracted by EIC limited to design,

Redevelopment At St Pancras

Wiremek successfully tendered to design, manufacture, deliver, test and commission the main HV/LV switchgear throughout the busy St Pancras railway station site.

Power Saving For University Of Westminster

Wiremek replaced an LV switchboard at the University's Cleveland Street site which is fed via four 400 amp

85 Fleet Street, London - Former Reuters News

Refurbished in 2006/2007, Wiremek were responsible for designing, manufacturing, installing and commissioning:-

2 x 11000v - 400v packaged sub-stations, main LV distribution, Mains/generator auto controls and sub-distribution via rising busbar. 

Willis Group, Ipswich

Having carried out maintenance of the Main low voltage switchgear for a number of years, in 2007 Wiremek were involved in the design, manufacture, installation and commissioning of replacement Main low voltage panels.