Published in Latest News

Tower Hamlets Mile End Hospital, London

Starting in 1997 Wiremek modified the exisiting Heating and Ventilation control system by the integration of a front end controlled Building Energy Management System.

Over a number of years the steam plant been replaced with individual gas fired heating systems.

The BEMS required additions and modifications - the largest being the addition of a new Mental Health Unit.

Wiremek also carry out controls maintenance and attend breakdowns as and when required.

There is also plans for a new Education Block scheduled for 2008 to be added to the system.

Recent Projects

Monitoring & Control At Harlow Leisurezone
Wiremek - Harlow Wiremek was contracted by EIC limited to design, manufacture, install and commission a multi

protocol building management system (BMS) for this brand new leisure complex

Read More


Redevelopment At St Pancras
Wiremek - St Pancras Wiremek successfully tendered to design, manufacture, deliver, test and commission the main HV/LV switchgear throughout the busy

St Pancras railway station site.

Read More

Latest News

  • Vacancy - BMS/Electrical Sales Estimator

    We are looking to recruit an enthusiastic estimator who will work closely with Directors, Managers and Project Engineers to deal with incoming enquiries for BMS products and LV systems.

    Applications are invited from individuals with a technical estimating/sales or projects background ideally in BMS/ HVAC or the electrical components industry.

    Read More
  • Willis Group, Ipswich

    Having carried out maintenace of the Main low voltage switchgear for a number of years, in 2007 Wiremek were involved in the design, manufacture, installation and commissioning of replacement Main low voltage panels.

    Read More
  • Tower Hamlets Mile End Hospital, London

    Starting in 1997 Wiremek modified the exisiting Heating and Ventilation control system by the integration of a front end controlled Building Energy Management System.

    Read More