Monitoring And Control At Harlow Leisurezone

Wiremek was contracted by EIC limited to design,

 manufacture, install and commission a multi protocol building management system (BMS) for this brand new leisure complex. The project was extremely technical in its design due to different system requirements of heating, cooling and humidity throughout the complex.

Forthis project Wiremek used the Centraline by Honeywell system, ideally suited beacuse of the need to monitor and control the various types of meters and plant installed within the BMS. The installation incorporated graphic representation on a head end computer, three main control panels in two plant rooms and six outstations controlling multiple items of HVAC plant.

The Result: 

  • Project brought in on time and on target
  • High level of control functionality delivered
  • Strict adherence to project specification

Back To Projects