Environment agency – Peterborough

Wiremek were approached to achieve a concept for the replacement of the ageing switchgear which supplied this crucial regional office.

Wiremek were heavily involved in the design, manufacture, installation and commissioning of a mains/generator auto changeover panel which ensured the offices could carry on functioning at full capacity even during a lengthened mains failure.  The installation was carried out under rigorous inspection by the environment agency’s health and safety representative and was installed and commissioned during an overnight/weekend shutdown without any unforeseen difficulties which ensured the offices were up and running by the start of the working week.